Arboricultural Method Statement - Islington (January 2019)

Our client approached us to assist them in obtaining permission to rebuild a boundary wall in a Conservation Area in Islington. The existing wall had been displaced by root activity from a protected tree and required re-building. We prepared an Arboricultural Method Statement detailing how the tree would be protected during the demolition and rebuilding of the wall, along with advising on suitable construction techniques to ensure that the tree and the wall could co-exist without the immediate risk of further damage occuring.